PC MURIAH LTD KEPODANG

PC Muriah intends to develop Kepodang gas field which include the facilities such as CPP integrated with Wellhead module (8 slots/4 well), satellite Wellhead Tower, 14” diameter 200 km export pipeline and an Onshore Receiving Facilities. The agreed work are; Fire Water Demand Report and calculations; Fire Water Hydraulic Calculation and Report; Hazardous Area Classification Drawings